Hefty obligation crane 12m wire rope electrical hoist ten ton for sale
CZPT Wire Rope CZPT-Introduction:
CD, MD 0.five ~ 32t sequence wire rope electric hoist is a common transportable lifting equipment. The merchandise is compact in
composition,small in dimension,massive in lifting potential and vast in use. It is an powerful tool for enhancing labor circumstances and
enhancing productivity,and is a general lifting device for industrial and mining enterprises.
CZPT Wire Rope CZPT-Running Circumstances:
one.Altitude does not exceed 1000m
2.Ambient air temperature is -twenty ° C ~ +forty ° C
three.Ambient air humidity is not a lot more than eighty five% (at 25 ° C)
four.Energy: three-section AC, 380V, 50HZ. Motor terminal voltage fluctuation ±10%
five.The electric hoist is normally put in indoors. When installing outside, a rain go over should be additional.
When the earlier mentioned environmental situations are not fulfilled, particular orders are created in accordance to non-regular goods.
CZPT Wire Rope CZPT-Principal Composition:
Reducer, managing companies, roller gear, hook gadgets, couplings, flexible cable current into the system and
stopper.
Motor is with cone rotor motors, established the energy and braking force in one.
CZPT Wire Rope CZPT-Set up:
a) Utilised with LD and LX one beam cranes
b) Mounted on a fixed suspended I-beam rail for linear or curved movement
c) Fixed installation, for lifting or winch, divided into four ways: higher, decrease, remaining and correct
CZPT hoists are not ideal for use in environments with explosive or corrosive gases. They are also not suited
for lifting
molten,pink hot metals,other flammable and explosive resources.
Kind | CD1,MD1 | |||||||||||||||||||||||||
Capability | t | .5 | 1 | two | 3 | |||||||||||||||||||||
Lifting Height | m | six | 9 | twelve | six | 9 | 12 | 18 | 24 | thirty | 6 | 9 | 12 | 18 | 24 | 30 | 6 | nine | 12 | 18 | 24 | 30 | ||||
Lifting Velocity | m/min | 8(eight/.eight) | eight(eight/.8) | 8(eight/.8) | eight(eight/.eight) | |||||||||||||||||||||
Touring Speed | m/min | 20(thirty) | 20(30) | 20(thirty) | twenty(30) | |||||||||||||||||||||
Wire Rope |
Dia. | mm | four.8 | seven.four | eleven | 13 | ||||||||||||||||||||
GB1102-seventy four | six*37+1 | 6*37+1 | six*37+one | 6*37+1 | ||||||||||||||||||||||
Lifting Motor | Variety | ZD121-four ZDS1-.two/.8 |
ZD122-four ZDS1-.two/one.5 |
ZDone31-4 ZDSone-.4/3 |
ZDone41-4 ZDSone-.four/4.5 |
|||||||||||||||||||||
Power | kW | .eight(.two/.8) | 1.5(.2/1.five) | 3(.4/3) | four.five(.four/four.5) | |||||||||||||||||||||
Rotate Velocity | r/min | 1380 | 1380 | 1380 | 1380 | |||||||||||||||||||||
Traveling Speed |
Type | ZDY111-4 | ZDYoneeleven-four | ZDY112-four | ZDYonetwelve-4 | |||||||||||||||||||||
Electrical power | kW | .two | .two | .4 | .four | |||||||||||||||||||||
Rotate Velocity | r/min | 1380 | 1380 | 1380 | 1380 | |||||||||||||||||||||
Running Rail | sixteen-28b | 16-28b | 20a-32c | 20a-32c | ||||||||||||||||||||||
Operating Duty | M3 | M3 | M3 | M3 | ||||||||||||||||||||||
Procedure Times | h | 240 | 240 | 240 | 240 |
CD1,MD1 | ||||||||||||||||||||||||||
Potential | t | five | 10 | sixteen | ||||||||||||||||||||||
Lifting Peak | m | 6 | 9 | twelve | eighteen | 24 | 31 | nine | twelve | 18 | 24 | thirty | nine | 12 | 18 | |||||||||||
Lifting Pace | m/min | eight(eight/.8) | 7(seven/.seven) | three.five(three.5/.35) | ||||||||||||||||||||||
Traveling Velocity | m/min | 20(thirty) | twenty(30) | 20(thirty) | ||||||||||||||||||||||
Wire Rope | Dia. | mm | fifteen.5 | fifteen.five | fifteen.five | |||||||||||||||||||||
GB1102-74 | 6*37+one | six*37+one | six*37+1 | |||||||||||||||||||||||
Lifting Motor | Type | ZD141-4 ZDS1-.eight/seven.five |
ZD1fifty one-four ZDSone-1.5/13 |
ZD1fifty one-4 ZDSone-one.5/thirteen |
||||||||||||||||||||||
Electrical power | kW | 7.five(.eight/seven.five) | 13(1.five/13) | thirteen(one.5/thirteen) | ||||||||||||||||||||||
Rotate Velocity | r/min | 1380 | 1380 | 1380 | ||||||||||||||||||||||
Touring Speed | Type | ZDY121-four | ZDY121-four | ZDY121-4 | ||||||||||||||||||||||
Electrical power | kW | .eight | .eight*2 | .eight*two | ||||||||||||||||||||||
Rotate Pace | r/min | 1380 | 1380 | 1380 | ||||||||||||||||||||||
Managing Rail | 32-45c | forty-63c | 63c | |||||||||||||||||||||||
Operating Responsibility | M3 | M3 | M3 | |||||||||||||||||||||||
Procedure Moments | h | 240 | 240 | 240 |