Pipe Conveying Method for Conclude Beveling Machine
Design: PLTPS-24B1/B2
Performance attributes
Conveying the pipe automatically or manually when the finish beveling machine operates and the pipe can be removed from the equipment with a turnover system if required.
It will increase the automatization level in the pipe fabricating plant and decreases the dangers throughout hoisting.
CZPT parameters
Pipe diameter applicable: DN50~600(φ sixty~610)
Conveying duration: ≥ Conveying length
Line length: 7.5M (or depend on the situation)
Line height: 800MM
Substance of the roller bench: Carbon steel with blue taken care of surface (coated with rubber if necessary)
Conveying pace: 2~20M/Min
Velocity-regulation Manner: Manual/VF stepless pace adjustment
Handle program: Non-PLC handle (or is dependent on situation)
Turnover mechanism: Nil (or depends on the predicament)
Lifting program: A lifting technique is geared up so as to change the centre elevation of pipes routinely and to bevel the pipes of the distinct diameter.
Turning technique: A turning program is outfitted so as to flip pipe automatically and to bevel the two end of pipe(choice)
Description | Information |
Pipe diameter | DN50~600mm |
Conveying length | a lot more than 500mm |
Line top | 800MM |
Turning method | a turning method is outfitted so as to change pipe immediately and to bevel the two end of pipe(choice |
our company is the most innovation capacity company of built-in remedies for piping fabrication, also is the unique company of specialist piping plant design software & administration software program program and piping equipments in China which included pipe spool fabrication line, reducing equipments, bevelling equipments, fitting up equipments, dealing with equipments, welding equipments.