design passenger elevator construction raise / modest elevator lift / mini carry and elevator
ZheJiang Xingdou CZPT Co., Ltd is a professionalmanufacturer and exporter for components hoist.
one.fifteen years expert production knowledge and ten Many years exporting activities.
2. Great technician Crew with designation,innovation and advancement capabilities.
three. Zero accident document, Basic safety first.
four. The merchandise is straightforward to sustain and significantly less wearing elements. It turns to be that no donning areas require to be replaced for three-4 many years if the hoist ended up kept in excellent and regular upkeep by the a lot of follow from consumers.
5. Fast response from revenue and following-sale support. Crisis remedy offered inside of .five-12 several hours right after getting the customer’s criticism.
6. Give OEM for consumers, turn customers’ concepts into drawing design and style and into actual products, help enhancement, modification and tips Patiently.
7. Our products serve more than a hundred regions in far more than thirty countries, and the market place apply result is quite excellent.
8. We provide technical guide individual to go to the building website for installation guidance if needed.
9. Subsequent market apply reaction, we are often on the way for product enhancement and innovation!
Creation description:
Attribute | Model | Rated Loading | Lifting Speed | Motor Electrical power |
CZPT cages | SC200/200 | 2x2000kg | 33m/min | 2x(3x11kw) / 2x(3×8.5kw) |
SC150/150 | 2x1500kg | 33m/min | 2x(2x13kw) | |
SC100/100 | 2x1000kg | 33m/min | 2x(2x11kw) | |
Single cage | SC200 | 2000kg | 33m/min | 3x11kw / 3×8.5kw |
SC150 | 1500kg | 33m/min | 2x13kw |
Characteristics | Design | Rated Loading | Lifting Velocity | Motor Power | |
CZPT cages | Reduced speed | SC200/200D | 2X2000kg | -40m/min | 2x(3x11kw) / 2x(3×8.5kw) |
SC100/100D | 2x1000kg | -40m/min | 2x(2x13kw) | ||
Mid pace | SC200/200Z | 2x2000kg | -60m/min | 2x(2x23kw) | |
SC100/100Z | 2x1000kg | -60m/min | 2x(2x15kw) | ||
Single cage | Lower speed | SC200D | 2000kg | -40m/min | 3x11kw / 3×8.5kw |
SC100D | 1000kg | -40m/min | 2x13kw | ||
Mid velocity | SC200Z | 2000kg | -60m/min | 2x23kw |
Consideration to information
A: Cage Details
1.The cage is boarded up by all punched aluminum sheet ,Sidewall of Wire Mesh for cage is also CZPT. The size can be arranged to your necessity.
( Optional Dimension:3×1.5×2.1m, 3×1.3×2.1m, 3.2×1.5×2.1m, 3.2×1.3×2.1m, 3×1.5×2.4m, 3×1.3×2.4m, 3.2×1.5×2.4m, three.2×1.3×2.4m)
2. Principal framework of cage is created of high-good quality steel right after bending.(The bent metal is organization, good vertically, balance. Moreover it make sure secure of the total construction.)
B: Specifications about mast section of building passenger elevator design raise / little elevator raise / mini elevate and elevator
The Mast segment(color is variable) is produced of HF welding pipe and seamless pipe. (The higher top quality seamlesssteel pipe is very good vertically, anti-pressure, anti-aging, thickness and so on), it provide a well rail for cage climbs on.
650*650*1508mm is the most frequent measurement fit for clientele.
one. HF high high quality tube&pipe Q345B good vertical.
two. Metal plate Q235B with large high quality from Baosteel Team, steel plates are bent of U shape to stren-gthen the mast area
three. Mast part with galvanized coat or warmth spray coat can be decided on
four. Metal round bar Q235B with high good quality and reinforce the mast area Other model of mast part can choose:
450*450*1508mm, 650*900*1508mm,650*two hundred*1508mm
Components about Rack gear:
one.Design: forty*sixty*1508mm, or forty*60*1483mm or OEM according to drawing or sample
two.Resources: CL60 special rail steel,60# large high quality carbon steel(common use) or other variety C55,C50,C45 in accordance to your requirement.
C: Accomplished basic safety measures for building passenger elevator design elevate / little elevator carry / mini elevate and elevator
1. Equiping with Anti-falling govenor
2. CZPTal an Mechanical interlock: CZPT basic safety switches, Slack rope switch
3. Protection hook
four. Higher and base restrict swithes, lure door restrict switch
five. Overload protector
six. Bottom Buffer
seven. Stage Calling technique and car leveling unit to be pick.
D. Diverse driven system for construction passenger elevator design carry / little elevator raise / mini lift and elevator
Substantial successful&power conserving versions:
one. 2000kg load per cage can select motor: 3×8.5kw, 2x11kw, 2x13kw with vitality preserving people. 3x11kw with typical character. (With gearbox much more than 90% power use charge) low speed type
two. 1000kg load for each cage can choose motor: 2×8.5kw, 2x11kw with gearbox far more than ninety% strength usage rate.) reduced velocity type
three. 1500kg load per cage can choose motor: 2x13kw, 2x15kw with gearbox or worm reducers. Low pace kind
4. 2000kg load with mid-velocity: 3x15kw,2x23kw and 2x26kw with higher effective gearbox.
Notice: (SEW,CZPT OR KOREA Model MOTOR COULD BE Pick)
Packing&Shinping
building passenger elevator design raise / small elevator lift / mini lift and elevator is the most important matter, but we can not disregard the value of deal. Effectively bundle can protect the solution from crash, rust ,mess and so on. It is straightforward for our clients to determine diverse spare parts, easy loading and unloading. We shell out a lot much more interest to the details…
Services
We can provide you with in depth solution description drawings and installation methods. Provide you with the in depth dimension of the product.
1.We have a professional service group,all the support engineers have been great qualified and have effectively experiences which are proficient for their work. We can offer installation and commissioning if required.
two.The warranty interval is inside fifty percent a year since the installation and adjustment has been completed. All factors are in guarantee prolong besides electrical factors.
3.We guarantee to give a quick support reaction within 2 hours given that we received the maintenance telephone form clients.
4.We supply the support lined the total useful daily life of our solution, which such as upkeep, repair, complex up grade, managed services and so on.
five.We will routinely adhere to-up the check out on our clients given that they requested our merchandise. Your suggestion is very important for us!
FAQ
Iris Lu
Mob :-13791571828 Tel /Fax: -531-83821797
ZheJiang XINGDOU Smart Equipment CO.,LTD.
HangCZPT TOPALL CZPT & EQUIPMENT CO.,LTD. (Department)
Handle:CZPT CZPT Park, Xihu (West Lake) Dis. CZPT, ZheJiang Province, 255710.China
Net: Web: